Oprivo

Report receipt of waste: a plain guide for small yards and transfer stations.

Since 1 October 2026, permitted sites in England and Wales have had to report every load of controlled waste they receive. Here is who it covers, what goes in each report, how fast it has to be done, and what to capture at the gate so it isn’t a scramble.

Last checked 3 min readBy the Oprivo team

The Oprivo weighbridge desk for a fictional demo business: tickets today, vehicles on site, net tonnes today, average turnaround and needs review, a queue of vehicles and the new weigh ticket form
Waste & compliance panel on a waste receipt in Oprivo: the load, its waste status and evidence, with its transfer note and final disposal tracked

The short version

  • If you’re permitted or licensed to receive controlled waste, you report every load you receive to the government’s Report receipt of waste service.
  • England and Wales: mandatory since 1 October 2026. Scotland and Northern Ireland: January 2027.
  • Each record must be submitted within 2 working days, counted from the day after the waste arrives.
  • You can report through compatible software or Defra’s template spreadsheet, which is expected to stay until at least October 2027.
  • Waste transfer notes, consignment notes and your permit’s waste returns all continue alongside it.

Who has to report

GOV.UK says that if you are licensed or permitted to receive controlled waste, you need to enter details of every load you receive. That covers permitted operations, installations and mobile plant. Most household, commercial and industrial waste is controlled waste.

Some sites don’t need to report, according to GOV.UK as of 3 November 2026:

  • Household waste recycling centres in Wales, and those in England that receive household waste from residents.
  • Sites operating under waste exemptions, which are planned for a later phase with no date set.
  • Digitally excluded businesses, which keep written records instead. This applies where digital tools are impractical because of age, disability or location, or for religious reasons. Preferring paper, unfamiliarity with software or extra cost don’t qualify.
Source: GOV.UK, updated 19 October 2026.
Where the waste is receivedMandatory from
England and Wales1 October 2026
Scotland and Northern IrelandJanuary 2027

The 2 working day deadline

Records must be submitted within 2 working days, excluding weekends and bank holidays, counted from the day after the waste is received. A load that arrives on a Friday is due by the end of Tuesday, or later if a bank holiday falls in between.

For a small site the deadline itself is rarely the problem. The problem is chasing missing details from a carrier after the lorry has left. The fix is to get everything at the gate.

Recording an incoming load in Oprivo Sites & Yards for a fictional demo business: vehicle ZK21 FRG, driver Ewan Doig, the carrier fields, and a weighbridge reading of 5,240 kg gross minus 3,600 kg tare giving 1,640 kg net, with ticket WB-20417
Recording a load at the gate in Oprivo: the vehicle, driver and carrier, then the weighbridge reading, gross minus tare.

What goes in each record

GOV.UK lists what the service collects for each load:

  • Waste movement details
  • Carrier and receiver details
  • Waste classification codes (EWC codes from the List of Waste)
  • Recovery and disposal codes
  • Persistent organic pollutant (POP) data
  • Hazardous waste data, including hazard property codes and component concentrations

In practice, that means you need at the gate: who brought it, their carrier registration, the vehicle, what the waste is and its code, how much there is, and where it came from. If a carrier’s paperwork is vague, it’s now your problem within two working days. Our guide to EWC codes covers the codes most loads from clearance, skip and grab firms carry.

Two ways to report: software or the spreadsheet

RouteHow it works
Software connected to the serviceYour waste software sends records to the service through its API. The software must be integrated with the API, and its provider must have run Defra’s production approval test scenarios and self-certified the results. Defra publishes a list of providers.
Defra’s template spreadsheetFor sites without connected software. You use Defra’s template unchanged, can add several movements before submitting, and start a new spreadsheet for each later submission. GOV.UK expects this route to stay until at least October 2027.

Check any provider against Defra’s published list before relying on it to submit for you.

What still applies alongside it

Until further notice, GOV.UK says you must keep doing the following as well:

  • Waste transfer notes and Annex VII forms. See how to fill in a waste transfer note.
  • Hazardous waste consignment notes, each entered as a separate entry in the service.
  • Waste returns under the conditions of your environmental permit.
  • Hazardous waste consignee returns, with charges still applying.
Site report RTN-0001 in Oprivo for 1 to 31 October 2026 at a fictional demo transfer yard: exported, finalised, regulator Scottish Environment Protection Agency, snapshot intact, marked not submitted by Oprivo, with Print, PDF and Export CSV
A period site report in Oprivo: opening and closing stock by code, finalised and versioned, exported as CSV or PDF. It is marked as not submitted by Oprivo.

Recording receipts in Oprivo

Sources

Last checked 3 November 2026. Rules and dates can change, so check the official guidance for your nation before relying on them. This guide is general information, not legal advice.

Report receipt of waste, answered.

Something else? See all questions or ask us.

Who has to use the Report receipt of waste service?

Anyone licensed or permitted to receive controlled waste, for every load they receive. That includes permitted operations, installations and mobile plant. Sites operating under waste exemptions aren’t in this phase.

How long do I have to report a load?

2 working days, excluding weekends and bank holidays, counted from the day after the waste is received.

When does it start in Scotland and Northern Ireland?

January 2027. England and Wales have been mandatory since 1 October 2026.

Can I report with a spreadsheet?

Yes. Sites without connected software can use Defra’s template spreadsheet, unchanged. GOV.UK expects the spreadsheet route to remain until at least October 2027.

Do I still need waste transfer notes and waste returns?

Yes. Until further notice, waste transfer notes, Annex VII forms, hazardous waste consignment notes and permit waste returns all continue alongside the service.

Does Oprivo submit to the Report receipt of waste service?

Yes. Add your site’s API code and switch reporting on, and Oprivo reports each finalised receipt to the service for you, sends any correction as an update, and keeps a copy of what was sent and the reply. Oprivo is listed on GOV.UK’s page of software providers for the service. The listing confirms Oprivo has self-certified against Defra’s published test scenarios; it isn’t an approval by Defra.

Start with 14 days free.

Set Oprivo up around your operation, explore the tools and see how it fits your business before committing.

  • 14-day free trial
  • Cancel at any time
  • No per-job charges